Longtan Hydropower Station in Guangxi

Longtan Hydropower Station is a backbone project in cascade development of the Hongshuihe River, with a giant power station and a large reservoir, 9 generating units with a total installed capacity of 5,400MW. Situated in Tian¡¯e County of Guangxi Zhuang Autonomous Region. With a drainage area of 98,500 km2, accounting to 71.2% of the Hongshuihe River's total. Average annually flow 1640m3/s and annual runoff 51.7 billion m3.

CGGC undertook the construction of left bank diversion tunnel, and bank slope, diversion tunnel, main dam works, and Dafaping aggregate system works.

(Upper Left) Diversion Tunnel excavating
(Upper Right)Completed diversion tunnel on left bank
(Middle Left)Stone apron in Dam Area
(Middle Right)Panorama of apron Works on Left Bank of Contract Section
(Lower Left)Bank Slope Construction
(Lower Right)Left Bank Slope
(Lower)Panorama of Longtan Dam Site

 

HOME¡¡£ü¡¡CHINESE¡¡£ü¡¡ENGLISH¡¡£ü¡¡SITEMAP¡¡£ü¡¡CONTACT US  
© 2001-2006 by China Gezhouba (Group) Corporation (CGGC). All rights reserved
ADD: No 1, Qingbo Road, Yichang, Hubei,China ¡¡PC: 443002¡¡Email£ºcggcieda@cggc.cn