Three Gorges Project of Yangtze River

CGGC is the main contractor of Three Gorges Project on the Yangtze river, the largest hydropower project in the world at present, has been assigned over 60% of works, especially constructed Phase I earth/stone cofferdam, open diversion channel on the right bank, Maopingxi diversion tunnel and protection dam, temporary navigation lock and ship lift on the left bank, navigation structure and lower approach, river diversion closure, and Phase II cofferdam and watertight barrier, plant foundation base rock excavation, concrete grouting and metal structure installation, diversion tunnel excavation, installation and commissioning of permanent ship lock metal structure mechanical/electric equipment during Phase II as well as other key project such as left and right powerhouses construction, diversion closure of open channel, and Phase III RCC cofferdam on right bank.

Left: CGGC completed open channel closure of TGP and dammed the Yangtze River the third time on Nov.6, 2002.
Upper Right: Phase ¢ó RCC cofferdam of TGP has fully reached 140-m elevation within four months' intense construction by CGGC on April 16, 2003.
Lower Right: Two-way five-step ship lock of TGP has been successfully put into commission, two luxuries Cruise ships are passing through the ship lock installed by CGGC.



Upper Left: CGGC dammed the Yangtze river the second time in TGP on Nov.8, 1997.

Lower Left: Diversion Closure Works was awarded ¡°The First Grade Prize of National Science and Technology Advance¡±

Upper Right: CGGC attended TGP commencement ceremony as a main contractor for construction.

Middle Right: CGGC completed the open diversion channel and longitudinal cofferdam project

Lower Right: CGGC completed a total of 7.74million m3 concrete in TGP Phase ¢ò Plant and Dam, amounts to 62% of total concrete with an annual maximum record of 2.58 million m3.

Lower: CGGC created a new record of annually in earth and rock excavating and filling 37.17million m3 and high slope for temporary ship lock.

 

CGGC has sets four world records in Yangtze main channel closure, i.e. water depth of diversion closure, discharge, daily and hourly intensity of earth and rock filling, awarded has been granted ¡° The First Grade Prize of National Science and Technology Advance¡±, also created a sets of new records in construction such as pouring concrete 2,581,000m3 in one year during Phase ¢ò, pouring block area 19,012m2 as well as monthly. Concreting intensity of 476,000m3, daily 21,066m3 and shift 7,438.5m3, hourly 1,278m3 during Phase ¢ó RCC cofferdam construction.

Worldwide Records of three Gorges Project

TGP is the largest Hydropower Project in the world at present, a great number of construction quotas has been broken the hydro-engineering top records both at home and abroad.

A Water Conservancy Project with the Most Sufficiency Preliminary Preparation

It has been 75 years since Dr. Sun Yat-Sen launched his great TGP plan in 1919 to formal commencement in 1994. It took half a century from early 1940s for survey, and research to 1950s-1980s for feasibility study and design. It is the most sufficiency preliminary work in the world and also the first water project that has been discussed and approved by National People's Congress.

A Project with Maximum Flood Control Benefit in the world

TGP possessed a total reservoir storage capacity of 39.3 billion m3, among which 22.15 billion m3 for flood control, After regulated the reservoir blood, the peak flood could be reduced to 27,000~ 33,000 m3 /sec., which ranks the worldwide top record. TGP would improve the flood prevention standard from a 10 years to 100 years flood frequency at Jingjiang reaches of the Yangtze River, 15million people and 1.53million hectares land could be protected from disaster brought extraordinary flood.

A Project with Maximum Installed Capacity in the World

A total 22,400MW output with 26 Hydroelectric Generating Sets of 700,000MW and annual average of 90 Tw/h. Hence TGP would be the largest hydropower Station in the world in 2009.

A Project most Remarkable Improvement Navigation Benefit in the World

The reservoir would improve the navigation condition from Yichang up to Chongqing and fleets of 10,000t

A largest Scaled Project

A large number of top records have been sets in construction of TGP, such as: Earth an rock Excavation, Concrete Placement, Metal Structure Installation, Installed Capacity of Hydropower Station, Permanent Navigation Lock Operating Head and high Side Slope Height, Ship Lift gross tonnage and lifting height and Construction Intensity of Phase ¢ó RCC cofferdam etc.

1.Length of Dam Axis is 2,309.47m , It installed 32 setss of 700MW turbo-generators, Two-way five-step ship lock and ship lift are largest scale in the world. TGP will be the largest scaled Water Conservancy Project in the world.

2.According to Preliminary Design, Earth and rock Excavation and Back Fill is 1350 million m3, Concrete Placement is 27.94 million m3, and Metal Structure Installation is 256,500 tons. TGP possessed the maximum quantity in the world.

3.TGP Phase ¢ò cofferdam has a water depth of 60m , Earth and rock back fill 12.2 million m3, impermeable barrier area 200,000 m2 , of which concrete impermeable wall 100,000 m3 and monthly intensity 3 million m3.

Maximum annual intensity of Concrete placement 5.48million m3,monthly intensity 553,500 m3 , and daily intensity 22,000 m3 in Phase ¢ò, all are world top records.

Phase ¢ó RCC cofferdam created a lot of world top records such as maximum block area up to 19,012 m3 , maximum monthly placement intensity up to 476,000 m3 and maximum daily intensity 210,066 m3 . All of these ranked the top construction intensity in world Water Conservancy Project.

4.Comprehensive difficulties of two diversion closures of TGP is seldom seen in the world's closure history. The maximum water depth of 60m during diversion closure is the top record in the world.

5.The capacity of flood discharge 100,000 m3 /s, is the maximum capacity in the world.

6.The maximum height of excavation slope of ship lock 170m is the highest in the world. With a total head of 113m is the maximum one in the world.

7.The effective dimension of Ship Lift is 120m ¡Á 18m ¡Á 3.5m , gross weight of 11,800 tons with maximum lifting height of 113m , and lifting weight of 3,000 tonnage, is the maximum scale and most difficulty ship lift in the world.

8.1.13 million of resetstlement peoples is the top record in the world hydropower project.



 

HOME¡¡£ü¡¡CHINESE¡¡£ü¡¡ENGLISH¡¡£ü¡¡SITEMAP¡¡£ü¡¡CONTACT US  
© 2001-2006 by China Gezhouba (Group) Corporation (CGGC). All rights reserved
ADD: No 1, Qingbo Road, Yichang, Hubei,China ¡¡PC: 443002¡¡Email£ºgzb@cggc.cn